Insutech if1
The IF1 System relies on a multi-layered approach to ensure absolute isolation. The layers are typically organized as follows:
Compacted Soil: The prepared sub-base for the foundation.
Blinding Concrete: The leveling layer upon which the waterproofing system is applied.
Insucoat Primer: A high-quality water-based bitumen primer that seals concrete pores and acts as an initial vapor barrier.
Modified Bitumen Membrane: The core waterproofing layer (such as Insuultra or Insuprene), torch-applied to ensure seamless protection.
Protection Board: A 4mm thick bituminous board that safeguards the membrane from mechanical damage during the backfilling process.
Consultants and structural engineers recommend the IF1 system for the following scenarios:
Buildings with Isolated Footings: Where a full raft foundation is not required.
Absence of High Groundwater: Ideal for sites where the foundation is at ground level or not subject to constant hydrostatic pressure.
Rebar Protection: Preventing soil-borne salts and sulfates from reaching the reinforcement steel in footings and tie-beams (Meda).
Execution Efficiency: A pre-engineered system that allows contractors to apply waterproofing with high precision and speed.
High Durability: The use of polymer-modified bitumen membranes (APP or SBS) ensures the system remains flexible during minor soil settlement.
Mechanical Safety: The inclusion of "Protection Boards" prevents the membrane from being punctured by sharp stones or debris during backfilling.
International Compliance: The system meets the highest quality standards, including ISO and CE certifications for 2026.
share this product
Related Products
View All ProductsNeed professional support? Explore our industrial chemical services.
View Our Services