Marmox Elipse Water Heater
Technical Property | Official Certified Value | Engineering Benefit |
Heating Source | Central Hot Water / Hydronic System | Energy-efficient space heating integrated with central boiler networks |
Surface Design | Smooth oval patterned decorative finish (Elipse) | Adds a soft architectural texture and modern aesthetic to interior walls |
Installation Profile | Wall-mounted with concealed valve fittings | Slim profile that seamlessly replaces standard bulky metal radiators |
Safety Standard | 100% water-based operation with zero electrical parts | Completely safe for installation in wet environments and living spaces |
Thermal Output | Direct radiant heat dissipation | Uniform, dust-free radiant warmth preserving indoor air quality |
Elipse water heater
Sustainable Hydronic Operation: Operates using hot water from central heating loops, eliminating electrical power consumption.
Modern Oval Aesthetic: Soft artistic surface elevates interior design while providing functional thermal energy.
Slim Wall-Mounted Profile: Converts space heating into a compact wall panel with minimal room protrusion.
Safe & Hygienic: Free of internal electrical circuits, offering a clean, silent, and maintenance-free heating solution.
Uniform Heat Emission: Provides consistent radiant thermal comfort without stirring up ambient dust.
Residential Living Rooms & Bedrooms: Modern wall-mounted hydronic radiator for central heating networks.
Luxury Bathrooms & Suites: Clean, safe, water-based space heating suitable for high-humidity interiors.
Central Boiler Projects: Ideal specification for apartment complexes using heat pumps or central boilers.
Executive Offices & Reception Areas: Premium decorative heater that enhances interior aesthetics while maintaining energy efficiency.
Plumbing Layout: Route supply and return central heating pipes to the target wall location prior to surface finishing.
Wall Mounting: Fasten heavy-duty mounting brackets securely into solid wall structures using appropriate anchors.
Hydronic Hookup: Connect inlet and outlet valves to the central heating loop and balance system flow rates accordingly.
Pressure Testing: Perform a system pressure leak test prior to initial seasonal commissioning.
share this product
Related Products
View All ProductsNeed professional support? Explore our industrial chemical services.
View Our Services