بيتوبروف
بيتوبروف
بيتوبروف هو دهان بيتوميني عازل للرطوبة، يعتمد في تركيبته على المستحلبات البيتومينية عالية الجودة. يتميز المنتج بقوامه المتجانس الذي يشكل غشاءً عازلاً قوياً ومستمراً بعد الجفاف.
Chemical Base: High-grade Bitumen Emulsion.
Density: Approx. 1.02 g/cm³.
Solid Content: Complies with Egyptian Standard Specifications.
Approvals: Certified for use in major 2026 national projects, including Ministry of Housing and Educational Buildings Authority specifications.
bituproof
Superior Adhesion: Bonds effectively to all common construction substrates, including concrete, cementitious screeds, and masonry bricks.
Cold-Applied Efficiency: Ready to use directly from the container without heating, making it safer, faster, and more labor-efficient on-site.
High Chemical Resistance: Provides an excellent barrier against soil-borne salts, chlorides, and sulfates that typically degrade concrete foundations.
Cost-Effective Solution: Offers excellent coverage rates, reducing the overall cost of the damp-proofing item in large-scale projects.
Eco-Friendly & Non-Toxic: Being water-based, it is safe for applicators and ideal for use in congested or poorly ventilated work zones.
Specialist STC Company supplies Bituproof to cover the following critical project requirements:
Building Foundations: Protecting isolated footings, neck columns, and ground beams.
Retaining Walls: Waterproofing concrete walls in direct contact with soil.
Water Tanks (External): Preventing external groundwater from penetrating the tank’s structural body.
Sanitary Works: Protecting manholes, inspection chambers, and concrete infrastructure for sewage networks.
To ensure maximum performance through Specialist STC Company supplies:
Surface Preparation: Substrates must be clean, sound, and free from dust, oil, grease, or loose particles.
Priming Layer: It is highly recommended to apply a primer coat by diluting Bituproof with 20-30% clean water to ensure deep penetration into the concrete pores.
Main Coating: Apply at least two coats in perpendicular directions using a brush, roller, or airless spray.
Drying Interval: Allow the first coat to dry completely (typically 2 to 4 hours) before applying the second coat.
