منتج Conface2 من سي ام بي في مصر

Conface 2

Made to order

Conface 2 is a premium grade, ready to use chemical formwork release agent engineered for application on wooden, metallic, and plastic molds prior to concrete casting.

Technical Property

Official Certified Value

Engineering Benefit

Classification

Chemical Formwork Release Agent (Mold Oil)

Prevents mechanical bonding between setting concrete and form faces

Surface Excellence

Fair-Faced Concrete Standard Output

Delivers non-staining, clean surfaces minimizing post-stripping remedial work

Equipment Defense

Corrosion-Inhibiting Matrix for Steel Molds

Extends the operational lifespan of steel panels and timber shutters

Coverage Efficiency

High Spreading Rate Viscosity Profile

Extremely economical choice providing wide area output per liter

Substrate Compatibility

Optimized for Timber, Steel, Plywood, and Plastics

Full site versatility across variable dynamic formwork frameworks

conface 2

  • Unparalleled Stripping Action: Provides quick, smooth release of forms, protecting thin concrete details and corner geometries from spalling.

  • Pristine Concrete Quality: Guarantees zero residual staining, allowing subsequent plaster, paints, or protective epoxies to bond perfectly.

  • Formwork Preservation Shield: Denies dynamic concrete residue buildup, making mold cleanup fast and optimizing turn-around cycles.

  • Rain Washing Deflector: Once applied and dry, it shows strong resistance to light rainfall showers or high humidity prior to concrete placement.

  • Advanced Cost Optimization: Formulated to offer vast coverage metrics compared to traditional spent diesel oils or crude lubricants for 2026 metrics.

  • Direct coating for softwoods, plywood panels, and laminated shuttering timbers across all structural layouts.

  • Protection and release lining for heavy-duty steel and aluminum formworks to avoid rusting and facilitate quick stripping in Egypt.

  • Release agent application for fiberglass molds and heavy plastic matrices used inside precast concrete manufacturing plants.

  • Processing lining for dynamic tunnel forms and slip-form systems requiring rapid, consecutive stripping schedules.

  • Formwork Preparation: Ensure all mold and shuttering faces are thoroughly clean, structural intact, and cleared of old concrete laitance, dust, and scaly rust.

  • Application Technique: Apply Conface 2 uniformly using a professional low-pressure chemical spray pump, brush, roller, or clean cloth. Avoid excessive accumulation or pooling to guarantee a flawless concrete finish.

  • Casting Schedule: Concrete can be placed immediately after the film sets. It is recommended to coat formworks shortly before erection to prevent prolonged exposure to site dust.

  • Re-use Protocol: Upon form stripping, clean the face with a quick wipe down to remove minor dust, leaving the mold ready for subsequent coating cycles.



1